Project name :

construction of main channel of Khoda-Afarin and related buildings

Employer :

Ardabil Water supply company

Consultant:

Tavan Ab consultant engineers

Location :

Ardabil province-Pars Abad

Term of contract :

18 months

General information


Project specifications  

Construction of channel with trapezius cross section with concrete coverage to width of 4 meters, height of 3.71 meters, length: 6.28km

Construction of concrete culvert together with required entrance and exit structure with quantity of 9.  

Construction of pond and water intake structures

  Construction of bridge for vehicles: 1

Construction of Amil and Aviv regulators: 1 pcs each one

Construction of regulating-storage tank in Jafarabad with capacity of 300.000M3

Construction of emergency overflow and discharge vents

Construction of service Road parallel to main channel  


Khoda-Afarin channel (in progress)

Project name :

irrigation network-Piranshahr 2

Employer :

Agriculture-jahad organization of West Azarbaijan

Consultant:

Abgir consultant engineers

Location :

West Azarbaijan-Piranshahr

Term of contract :

36 months

General information


Project specifications  

Implementation of irrigation system in an area of 2270ha

Watering pipes with diameter of 90 to 250mm to length of 130km

Lateral with diameter of 63mm to length of 1250km

Implementation of irrigation system in an area of 160ha

Installation and implementation of 44 filtration station  

Construction of 580 concert basin and 650 brick basin

Construction of a building and 2 niches  


 irrigation network-Piranshahr 2  (in progress)

Project name :

Khoda-Afarin pump station (in progress)

Employer :

Ardabil Water supply company

Consultant:

mahab gods consultant engineers

Location :

Ardabil province-Pars Abad

General information


Project specifications  

Construction of 9 concrete storage with capacity of 10 to 80m

Construction of pumping stations including execution of mechanical  and electrical equipment and control of precision tools of 9 pump house.

Construction of pump house mill building , commissioning pump houses and training staff of employer for two months.



Khoda-Afarin pump station (in progress)